“Scheduled” icon not added when task is lumped in with other tasks on schedule
If I have a task A on the schedule and then add task B alongside it ( so it shows as A / B), B does not show the scheduled icon. It does show it for A. It would show for B if I scheduled it in its own time block
Log in to comment and vote
Comments1
Feb 27
PinnedThis should be fixed by now, btw, let me know if it’s not. Thanks Howard!